Home / Guides / Asbestos shed roof in Birmingham
Guides
Asbestos Shed Roof in Birmingham: What to Do
Grey corrugated cement-style sheets on an older garden shed can hold asbestos. The safe first step is to leave them untouched, confirm what they are, and use the official routes for removal and disposal. We do not take those sheets down.
- Leave suspect sheets in place and do not drill, break or jet-wash them
- The city can collect small, wrapped amounts from a home
- After the sheets have been handled properly, the rest of the shed can come down in the usual way

Request a quote
If the rest of the shed still needs to come down after the roof is dealt with, tell us about the building and the access.
How to tell if a shed roof may contain asbestos
Asbestos was used in building work in the United Kingdom before 2000, often mixed into cement and formed into corrugated roof sheets. A grey, mossy, profiled sheet on a shed or garden store from that period is a reason to pause, not a reason to start levering it off.
Looks alone are not proof. Similar modern sheets are made without asbestos. The only sure confirmation is a laboratory test of a sample taken carefully by someone who knows how. Until you know, treat the roof as if it does contain asbestos cement, and do not walk on it: these roofs are fragile even when they look sound.

What official guidance says about asbestos cement sheds
The Health and Safety Executive publishes a task sheet, a14, on removing asbestos cement sheets, gutters and small structures such as a shed, provided the material stays intact. It is not a casual DIY leaflet. The expected controls include training, protective clothing, damping, and lowering whole sheets rather than dropping or breaking them.
If the sheets are already badly broken, or if the work would smash them, the job can move into a stricter category known as notifiable non-licensed work. Other asbestos products, such as insulating board or lagging, are a different matter and need a contractor licensed by the HSE. The task sheet itself is the published A14 guidance to follow: HSE a14 (PDF).

What not to do
Most of the harm comes from breaking the sheets and raising dust.
- Do not smash, saw, drill or scrape the sheets
- Do not use a pressure washer or a stiff yard broom on the roof
- Do not drop sheets or send them down a rubble chute
- Do not put them in an ordinary skip or in the household bin
- Do not take them to a Birmingham Household Recycling Centre
- Do not leave broken pieces loose on the soil
The Birmingham civic collection
For a small quantity of asbestos cement from a home, the city runs a collection.
- 1
Wrap and stack
Sheets should be wrapped and sealed in heavy-duty plastic. Debris goes in double plastic sacks. Stacks must be light enough for two people to lift.
- 2
Request a collection
You need a BRUM account. The published wording says it will collect up to six bags from a home, once in a six-month period, and that it does not offer a chosen day.
- 3
Leave it at the front
The wrapped material should be left at the front of the property. The published wording says it aims to collect within two weeks.
- 4
Larger amounts need a contractor
If you have more than the official collection will take, you will need an independent contractor who can move asbestos waste lawfully. Birmingham publishes the collection rules on its request-asbestos-removal information.
Why the sheets cannot go to a Birmingham tip
The city is clear: asbestos is not accepted at its Household Recycling Centres, and it is also refused on van bookings and at mobile waste sites. Neighbouring authorities have their own rules, which can change, so do not assume a tip in Solihull or Sandwell will take it either.
Moving asbestos waste has its own paperwork. An ordinary hired van and a Saturday tip run is not a lawful route. That is one reason a 'bag it and hope' approach causes problems later.


Once the roof has been dealt with
The rest of the building is ordinary shed work.
After the sheets have gone via the official collection or a specialist contractor, the walls, floor and contents can be taken down in the usual way.
That remaining work is dismantling or, for a brick or concrete store, demolition.
Tell us that the roof has already been removed, or that it is still in place, so the quote matches the job that is actually left.
Need the rest of the shed taken down afterwards?
Tell us what has already happened to the roof, and we will price the remaining work.
Asbestos shed roof questions
Do you remove asbestos shed roofs?
How can I tell without a test?
Is removing an asbestos cement shed roof always licensed work?
Can I put the sheets in a skip?
Will the city collect a whole roof?
Can I take asbestos waste to a tip in Birmingham?
What can you do if the roof is still on the shed?
Does this change the price of the remaining work?
Where are the official rules published?
Ask about the rest of the shed
If the roof is already sorted, or you know it is ordinary felt, send a view of what remains; we will price the rest of the building from those.
